The City of Atlantic Beach has opened its reimagined lifeguard station, a significant enhancement to the city's commitment to public safety along its beautiful coastline.
While keeping the core of its William Morgan design intact, this modern facility designed by Cronk Duch Architecture and Planning will provide Atlantic Beach lifeguards with improved resources and capabilities, further ensuring the well-being of residents and visitors enjoying the ocean.
Located at the Ahern Street beach access – which has a new dune walkover, to boot – the new lifeguard station replaces an aging structure and boasts a range of upgrades designed to optimize response times and lifeguard effectiveness.
City officials unveiled the lifeguard station at a May 20 ribbon cutting.
“Today we gather not just to cut a ribbon but to open a new chapter and how we protect and serve those who enjoy this beautiful coastline of ours,” Mayor Curtis Ford said.
The lifeguard station was built by ACON Construction Co. The project had significant oversight and involvement by Police Chief Vic Gualillo and City Engineer Steve Swann.
"It’s designed for efficiency and built to support the people who put their lives on the line every day to keep beachgoers safe,” said longtime lifeguard Capt. John Phillips. “More than that, it’s a place of potential. It’s a place where future lifeguards will be trained, where local youth might get their first introduction to public service, and where teamwork and dedication will continue to thrive. It’s an investment in both infrastructure and in people.”
Funded in large part by the City of Jacksonville, the construction of the new lifeguard station underscores the City of Atlantic Beach's ongoing dedication to maintaining a safe and enjoyable environment for all beachgoers.
Beachgoers are encouraged to swim near lifeguard-protected areas and adhere to all posted beach safety flags and instructions.
Key Enhancements:
· Enhanced Visibility: The modern designs offer lifeguards panoramic views of the beach, crucial for spotting swimmers in distress.
· Expanded First Aid and Emergency Response Capabilities: Dedicated areas for medical supplies, equipment, and initial treatment, allowing for more efficient and effective on-site care.
· Increased Storage and Operational Space: Ample room for essential lifeguard equipment, including rescue boards, ATVs, and first aid supplies, promoting better organization and readiness.
· Comfort and Accessibility: Designed with the comfort and operational needs of lifeguards in mind, including improved facilities and accessibility, new restrooms and shower facilities, and a multi-purpose flex training area.
· Improved Public Beach Access: Designed with two publicly available accessible parking spaces along with a public shower, walkway, and dune walkover to the beach.
· Historic Significance: The new structure was built with a nod to its original design.